Asphalt Road in Birendranagar Municipality
We are proud to announce the successful completion of the Integrated Infrastructure Development Works at Birendranagar Municipality, Surkhet, a transformative urban infrastructure project aimed at enhancing connectivity, resilience, and quality of life for the growing population of this vital provincial capital.
Project Overview:
-
Project Name: Integrated Infrastructure Development Works
-
Location: Birendranagar Municipality, Surkhet
-
Total Road Length: 16.035 km
-
Project Duration: 28 Months
-
Scope Includes: Asphalt Concrete Road, RCC Drainage, Retaining Walls
Scope of Work:
The project focused on comprehensive urban road and infrastructure upgrades, including:
-
Construction of 16.035 km of road, designed for long-term durability and improved urban mobility.
-
Asphalt Concrete Surfacing for smoother, high-performance roadways suitable for mixed traffic flow.
-
RCC Drain Construction to ensure effective stormwater management and minimize flooding during monsoon seasons.
-
Retaining Walls for slope protection and structural stability, especially in vulnerable sections.
Key Achievements:
-
Successfully delivered a multi-component urban development project in 28 months.
-
Improved transportation infrastructure and drainage systems, directly benefiting residents and local businesses.
-
Strengthened urban resilience through well-engineered retaining structures and durable pavements.
This project marks a major step toward sustainable urban development in Birendranagar, aligning with the vision of modernizing infrastructure across Karnali Province. We extend our gratitude to the local community, technical teams, and stakeholders who contributed to this milestone.
We are proud to announce the successful completion of the Integrated Infrastructure Development Works at Birendranagar Municipality, Surkhet, a transformative urban infrastructure project aimed at enhancing connectivity, resilience, and quality of life for the growing population of this vital provincial capital.
Project Overview:
-
Project Name: Integrated Infrastructure Development Works
-
Location: Birendranagar Municipality, Surkhet
-
Total Road Length: 16.035 km
-
Project Duration: 28 Months
-
Scope Includes: Asphalt Concrete Road, RCC Drainage, Retaining Walls
Scope of Work:
The project focused on comprehensive urban road and infrastructure upgrades, including:
-
Construction of 16.035 km of road, designed for long-term durability and improved urban mobility.
-
Asphalt Concrete Surfacing for smoother, high-performance roadways suitable for mixed traffic flow.
-
RCC Drain Construction to ensure effective stormwater management and minimize flooding during monsoon seasons.
-
Retaining Walls for slope protection and structural stability, especially in vulnerable sections.
Key Achievements:
-
Successfully delivered a multi-component urban development project in 28 months.
-
Improved transportation infrastructure and drainage systems, directly benefiting residents and local businesses.
-
Strengthened urban resilience through well-engineered retaining structures and durable pavements.
This project marks a major step toward sustainable urban development in Birendranagar, aligning with the vision of modernizing infrastructure across Karnali Province. We extend our gratitude to the local community, technical teams, and stakeholders who contributed to this milestone.


