Ratna Rajmarga, Nepalgunj Road (Jamunaha – Rajha Section)
We are proud to announce the successful completion of the Rehabilitation and Asphalt Overlay Work at Ratna Rajmarg, Jamunaha–Rajha Section, covering a total stretch of 10 kilometers. This vital section of roadway, which transitions from a 4-lane to 6-lane configuration within urban areas, plays a critical role in facilitating smooth transportation and regional connectivity in the western Terai region of Nepal.
Project Overview:
- Project Name: Rehabilitation and Asphalt Overlay Work at Ratna Rajmarg (Jamunaha–Rajha Section)
- Location: Banke District, Nepal
- Road Length: 10 km
- Lane Configuration: 4-lane to 6-lane (in city areas)
- Project Duration: 10 Months
- Total Asphalt Quantity: 10,151.64 m³
Scope of Work:
The project involved comprehensive roadway rehabilitation activities, including:
- Asphalt Overlay Works for surface strengthening and smoother ride quality.
- Semi-Grouting Repairs to address base layer deterioration and patch failures.
- Base Compaction to ensure uniform load distribution and prevent future settlement.
- Glass Grid Installation for crack resistance and increased pavement lifespan.
Key Achievements:
- Timely delivery within 10 months, ensuring minimal disruption to public mobility.
- Enhanced road durability and safety through high-quality asphalt and reinforcement techniques.
- Significant improvement in urban traffic flow due to upgraded 6-lane segments.
This project marks another milestone in our commitment to quality infrastructure development and long-lasting transportation solutions. We thank all stakeholders, engineers, and on-ground teams who contributed to this success.
We are proud to announce the successful completion of the Rehabilitation and Asphalt Overlay Work at Ratna Rajmarg, Jamunaha–Rajha Section, covering a total stretch of 10 kilometers. This vital section of roadway, which transitions from a 4-lane to 6-lane configuration within urban areas, plays a critical role in facilitating smooth transportation and regional connectivity in the western Terai region of Nepal.
Project Overview:
- Project Name: Rehabilitation and Asphalt Overlay Work at Ratna Rajmarg (Jamunaha–Rajha Section)
- Location: Banke District, Nepal
- Road Length: 10 km
- Lane Configuration: 4-lane to 6-lane (in city areas)
- Project Duration: 10 Months
- Total Asphalt Quantity: 10,151.64 m³
Scope of Work:
The project involved comprehensive roadway rehabilitation activities, including:
- Asphalt Overlay Works for surface strengthening and smoother ride quality.
- Semi-Grouting Repairs to address base layer deterioration and patch failures.
- Base Compaction to ensure uniform load distribution and prevent future settlement.
- Glass Grid Installation for crack resistance and increased pavement lifespan.
Key Achievements:
- Timely delivery within 10 months, ensuring minimal disruption to public mobility.
- Enhanced road durability and safety through high-quality asphalt and reinforcement techniques.
- Significant improvement in urban traffic flow due to upgraded 6-lane segments.
This project marks another milestone in our commitment to quality infrastructure development and long-lasting transportation solutions. We thank all stakeholders, engineers, and on-ground teams who contributed to this success.