Ambe Steel Factory – Banke
Project Overview:
Ambe Steel Factory is a state-of-the-art industrial project located in the heart of Janaki Rural Municipality, Banke. Designed to support the growing demand for high-quality steel products in Nepal’s construction and infrastructure sectors, this facility is equipped with advanced manufacturing technologies and sustainable operational systems.
Project Scope:
The project involved the full-scale construction of a modern steel production plant, including civil, structural, mechanical, and electrical works. Built with a robust RCC and steel-framed structure, the factory houses production units, raw material storage, finished goods dispatch areas, administrative offices, utility buildings, and internal road networks.
The plant is designed for efficiency, safety, and scalability, with specialized zones for rebar rolling, cutting, bending, and steel treatment processes. The layout ensures smooth workflow, worker safety, and minimal environmental impact.
Key Features:
- Location: Janaki Rural Municipality, Banke District
- Total Built-up Area: 19,759.57 Sqm
- Facility Type: Industrial Steel Production Plant
- Structure Type: Steel and RCC Composite Structure
Main Facilities Include:
- Production & Processing Units
- Raw Material & Finished Goods Warehouses
- Quality Control Lab
- Worker Dormitory & Canteen
- Administrative Block
- Fire Safety and Waste Management Systems
- Weighbridge and Loading Bays
Technology & Standards:
The factory incorporates modern industrial automation and follows national and international quality standards for steel manufacturing. Energy-efficient equipment, pollution control systems, and water recycling mechanisms are integrated to promote environmental sustainability.
Project Objective:
To establish a high-capacity steel manufacturing unit that meets the structural steel needs of major infrastructure and construction projects across Nepal, while supporting local employment and industrial growth.
Project Overview:
Ambe Steel Factory is a state-of-the-art industrial project located in the heart of Janaki Rural Municipality, Banke. Designed to support the growing demand for high-quality steel products in Nepal’s construction and infrastructure sectors, this facility is equipped with advanced manufacturing technologies and sustainable operational systems.
Project Scope:
The project involved the full-scale construction of a modern steel production plant, including civil, structural, mechanical, and electrical works. Built with a robust RCC and steel-framed structure, the factory houses production units, raw material storage, finished goods dispatch areas, administrative offices, utility buildings, and internal road networks.
The plant is designed for efficiency, safety, and scalability, with specialized zones for rebar rolling, cutting, bending, and steel treatment processes. The layout ensures smooth workflow, worker safety, and minimal environmental impact.
Key Features:
- Location: Janaki Rural Municipality, Banke District
- Total Built-up Area: 19,759.57 Sqm
- Facility Type: Industrial Steel Production Plant
- Structure Type: Steel and RCC Composite Structure
Main Facilities Include:
- Production & Processing Units
- Raw Material & Finished Goods Warehouses
- Quality Control Lab
- Worker Dormitory & Canteen
- Administrative Block
- Fire Safety and Waste Management Systems
- Weighbridge and Loading Bays
Technology & Standards:
The factory incorporates modern industrial automation and follows national and international quality standards for steel manufacturing. Energy-efficient equipment, pollution control systems, and water recycling mechanisms are integrated to promote environmental sustainability.
Project Objective:
To establish a high-capacity steel manufacturing unit that meets the structural steel needs of major infrastructure and construction projects across Nepal, while supporting local employment and industrial growth.


